NOTICE: Works upgrading cycle parking provision in Drury Street Car Park

Posted 19 Dec 2017 to News by Sarah Scannell

Dublin City Council are preparing to start works on upgrading the cycle parking provision in Drury Street Car Park early in 2018. With this in mind we have to temporarily close the existing cycle parking provision to allow works proceed.

Dublin City Council intend to close off the cycle parking in Drury Street Car Park from 9 am on Thursday the 4th of January. Advance notice of this has already been erected in Drury Street Car Park(see attached). Temporary fencing will be erected preventing people accessing the cycle parking area from this date. We will open the fencing between 5pm and 6pm on both Thursday the 4th and Friday the 5th to allow people who have missed the advance notice to remove their bikes. However  from Monday the 8th of January we will be arranging to remove any remaining bikes to our Cherry Orchard depot. These bikes will be kept for a month, after which time if unclaimed, we will dispose of them.

From Monday the 15th of January we will be providing 120 temporary cycle parking spaces, 60 on the ground floor and a further 60 located to the side of the ramp connecting the ground and first floor. The location of the temporary spaces may need to change as the works progress but we will endeavour to provide at least 120 spaces at all times.

The expected duration of the works is 10-12 weeks.

Drury Street Notice to customers